I. Engineering working out and building up of a new nuclear power plants on the «turnkey basis»:

  • building up of a new thermal and nuclear power plants on the «turnkey» basis, along with planning project works.
  • engineering services and building up of a power plants with full optional construction supplies and equipment

Energoatomengineering Energoatomengineering Enegroatomengineering/

II.Installation, commissioning and reconstruction for the power plant electric appliances and industrial plants.

  • Installation of electric appliances for the thermal and nuclear power plants, substations and industrial plants.
  • Commissioning of electric appliances for the thermal and nuclear power plants, substations and industrial plants.
  • Repair and reconstruction of electric appliances for the thermal and nuclear power plants, substations and industrial plants.

Enegroatomengineering/ Enegroatomengineering/ Enegroatomengineering/

III.Installation, commissioning and reconstruction of a main equipment for the power plants and industrial plants:

  • Installation, commissioning and reconstruction of a main equipment for the power plants and industrial plants.
  • Commissioning of main equipment for the thermal power plants and nuclear power plants, heating plants and for power engineering equipment of industrial plants.
  • Power engineering equipment repair for the power plants, complex reconstruction of power facilities, facility restoration works after natural disasters and accidents.

Enegroatomengineering/ Enegroatomengineering/ Enegroatomengineering/

IV.Building-up, installation, repair and reconstruction of a conduit heat network.


Enegroatomengineering/ Enegroatomengineering/ Enegroatomengineering/

V.Building-up, installation, repair and reconstruction of a main oil and gas pipelines.


Enegroatomengineering/ Enegroatomengineering/ Enegroatomengineering/

 

Potential and advanced achievements:

  • experience in electric installation works at the outstanding nuclear power plants sites and research centers and nuclear power plants head blocks.
  • installation of a turbine-generated power plants from 6 to 1500 mVA;
  • installation of a special-purpose power supplied accumulators and diesel power plants.
  • power transmission line pole installation up to 330 kW in conditions of Altai Mountains, Qizilqum desert
  • distribution substation installation with the voltage up to 750 kW.
  • installation of a current distributors and busbars, electrical equipment installation and distribution networks installation, measurement and testing devices and radionuclear devices, research-and-development, industrial gamma-ray units
  • installation and commissioning of a electric appliances from 110-330 and 750 kW, including power converter with single-unit capacity up to 1250 kVA, test panels with the power capacity 1150-1500 kW, circuit-breakers
  • experience at the sites of a main pipelines compressor plants and power railway substation either.

Company news

22.04.2013

On April 22nd the working visit has been accomplished between the director-general of the State Atomic Energy Corporation «RUSATOM» S.Kirienko, Governor of the Voronezh region A.Gordeev and director-general of a CJSC «Energoatomengineering» V.Kutumov at the Novovoronezh NPP-2 site. The purpose of visit was the site inspection and taking insight view into NPP’s building-up process.

read more »



13.04.2013

Completion the construction works at the Novovoronezh NPP’s first energy unit: ready-made reactor building and the highest cooling tower at the territory of Russia. The installation is about to start with CJSC «Energoatomengineering» Enterprise assistance.

read more »



09.01.2013

Overnight into 21 to 22 December, the First nuclear steam generator has been installed into technical assignment at the nuclear building of the Unit № 3 Rostov NPP with CJSC «Sezam», being an integral part of «Energoatomengineering» holding.

read more »



Video