Projects


At the present day, holding entities are being assigned at the dozens sites for industrial and civilian purpose, sharing their expertise, working out and encourage applying innovative solutions, carrying out qualitative work in a timely manner. Being faithful to the principles of professional development and onward movement, we welcome you to join mutual collaboration and to a brand new projects!

Presently, the rigorous team of "Energoatomengineering" Holding is engaged in building and assembly works at the following industrial and civilian sites:

OJSC "PEM":

Work completion time Site Class of works
2003-till present. Television tower"«Ostankino»" Dismantlement, installation of DB -10/0,4 kW. Transforming station (TS) installation – 10/04 kW. (two transformer «Trixal» -1250 kW, equipment 10/04 kW «Schneider Electric») at mark +63,4 m. Installation MDB (12 units) at mark +340 m. Buswire installation Canalis KTA – 25 3P+N 1000A, Canalis KTA-16 1600A, «Schneider Electric» from the mark +63,4 m. to the mark +340 m. Power cabling from the mark 0m to +367 m. Commissioning works.
2002- till present Chepetsk machine factory (Glazov city). Hooking up of technical water supply engineering system and cooling station. Installation РУСН 6/0, 4 kW. Power and control cabling, wiring termination in power supply switchboards cases: galvanic, forging, assembled one. Exterior lightning installation. Commissioning works.
2002- till present FGUP Gromov Flight Research Institute (Zhukovsk city). Lighting facilities installation along the flight runway. Weak current cabling at the territory of flight test center. Installation and hook up of boiler equipment. Filling station center reconstruction. Power grid reconstruction for the commercial buildings. Main contractor works.
2000-till present Complex of buildings and territories of the Kremlin of Moscow Setting up of fire alarm and intrusion systems. Intrusion system installation along the perimeter of the territory of the Kremlin of Moscow. Electric power supply works for lighting and ventilation water utilities at the National Kremlin Palace food production facility.
2005-till present OJSC Moscow polymetal factory Plant territory upgrading (asphalt works, landscape modification). Civil engineering. Electrical fitting works (dismantlement of the transforming stations (TS) equipment – 10/0,4 kW., transforming station (TS) installation-10/0,4 kW with embedded equipment «Schneider Electric», cabling 0,4 kW, 10kW, control switchgear room installation). Commissioning works for the power unit, equipment and network test.
2006-till present. OJSC «Electrozavod» "" Plant modernization: electrical works (dismantlement, power transformers installation, power and control cabling; dismantlement and installation of a test equipment). Commissioning works for the power unit, equipment and network test.

OJSC "MosSaem":

Work completion time Site Class of works
2007 Complex for radioactive waste reprocessing (KP RAO) at the Smolensk NPP Construction and installation works
2008-2009 Completion of block № 2 building-up, Volgodonsk NPP General construction works, special, custom installation works.
2008-2010 Turbine hall reconstruction, block №2, Volgodonsk NPP General construction works, special, custom installation,plumbing works.

JSC TBP «HEM»:

Work completion time Site Class of works
2003-till present Kalinin NPP (units 1,2) Modernization and equipment repair:
- penetration supersedence;
- instrumentation control systems and automation (CMD&A) supersedence and pressure control pipeline site.
- ОРУ-350 circuit breaker supersedence;
2005-till present Rostov NPP (unit 2) -Power cabling installation and main line cabling and off-site objects;
-Fire-fighting system installation
2004-till present NPP "Busher" Iran -Installation and commissioning of an engineering electrical equipment for two NPP safety control systems;
-pressure control pipeline installation
-construction and delivery of a cable sensor units for instrumentation control systems and automation (CMD&A) , assembly contour and conduit elements
2006-till present Kalinin NPP (unit 4) Power cabling installation and cabling of a temporary power service and lighting
2006-till present LLC «Aqua Vision» Plant (Istra city) " -Installation and commissioning of an engineering electrical equipment;
-Power mains installation ;
-Installation and commissioning of an engineering electrical equipment;
-Lighting installation, fire and security alarm system installation and communication system.
2007-2008 Tsimlyansk HPP, Rostov region Hydroengineering node repair works
2006-2010 NPP "Kudankulam "India Cable steel structures and instrumentation control systems and automation (CMD&A) delivery

JSC «SEZAM»:

Work completion time Site Class of works
2005-2006 OJSC "OJSC «URSA Chudovo city"Novgorod region Mass-type foundation arrangement for the cylindrical sand drier, cylindrical sand drier installation. Tube bundle repair of a heat-exchange unit for d water cooling.
2006 LLC «Atomtechenergo» Metal surveillance for the piping details, authorized by the Russian Technical Supervisory Authority.
2006 LLC «Research and production company (NPF) "Metarossa-М" Moscow city Manufacture of a piping details for Steampower plant and NPP
2006 LLC «Balbus» Moscow city Manufacture of a piping details for Steampower plant and NPP
2006 «Efremovsk» TPP Efremov city Manufacture of a piping details for Steampower plant and NPP
2006 LLC "Trubi 2000" Manufacture of a piping details for Steampower plant and NPP
2006 JSC «AtomTruboprovodMontazh»,Moscow city Manufacture of a piping details for Steampower plant and NPP
2006 - till present Rostov NPP unit 2 Equipment and pipe-line installation
2007 - till present Metallurgical complex «Severstal»"Cherepovets city,main contractor;«Spetstrest No.3» Turbine repair at the TPP site

Company news

22.04.2013

On April 22nd the working visit has been accomplished between the director-general of the State Atomic Energy Corporation «RUSATOM» S.Kirienko, Governor of the Voronezh region A.Gordeev and director-general of a CJSC «Energoatomengineering» V.Kutumov at the Novovoronezh NPP-2 site. The purpose of visit was the site inspection and taking insight view into NPP’s building-up process.

read more »



13.04.2013

Completion the construction works at the Novovoronezh NPP’s first energy unit: ready-made reactor building and the highest cooling tower at the territory of Russia. The installation is about to start with CJSC «Energoatomengineering» Enterprise assistance.

read more »



09.01.2013

Overnight into 21 to 22 December, the First nuclear steam generator has been installed into technical assignment at the nuclear building of the Unit № 3 Rostov NPP with CJSC «Sezam», being an integral part of «Energoatomengineering» holding.

read more »